ISM Workshop Presentations
Aurora (near Denver), Colorado September 12-13, 2006
 | Track 5 Integrating Safety into Design & Construction |  |
| Tuesday, September 12, 2006 |
| 10:30-12:00 | Panel Session | Panelists include Mr. Joe Bader, DNFSB |
| | Central Technical Authority a Systematic Approach to Nuclear Safety | Dr. Tim Arcano |
| 1:00-2:30 | Overview: DOE-STD-1189-2006, Integration of Safety into the Design Process | Richard Black, DOE-HSS |
| | Safety In Design: EFCOG's Perspective on Safety Management for Projects | Pam Horning, BWXT |
| 3:00-5:00 | ISMS and Design Process U233 Downblending and Disposition Project | Robert Szozda, Isotek Sys, ORNL |
| | Small Business ISMS Implementation Strategies for Line Item Construction Projects | Jack Zimmerman, DOE-PPPO |
| | Configuration Management | Rich Salizzoni, WSRC |
| Wednesday, September 13, 2006 |
| 8:30-10:00 | Mitigating Organizational Weaknesses | Mary Heaton, BHI National |
| | Using Human Performance to Eliminate/Reduce Errors in the Engineering Environment | James Hummer, Bechtel-WTP |
| 10:30-12:00 | Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL's Demonstration Bulk Vitrification System | John McDonald, CH2M Hill-Hanford |
| | Soil Excavation and Concrete Penetration Permitting Process at LLNL | Dennis Chew, LLNL |
| | WSRC in the Entire Life Cycle of Projects/Activities | Rich Salizzoni, WSRC |
| 1:00-2:30 | Safety in Design - SWPF Project Lessons Learned | David Amerine, Parsons |
| | Panel Review of Issues | |
| Summary |
| | Topic Summary | |
|
|
< BACK TO PREVIOUS PAGE
|
|