Conduct of Operations

Draft 2/9/2006

Suggested lines of inquiry and review approach

Performance Objective 1: Contractor Program Documentation

Effective implementation and control of operating activities are primarily achieved by establishing written standards in operations

Performance Objective 2: Contractor Program Implementation

2.1 Shift Routines and Operating Practices:

2.2 Investigation of Abnormal Events:  Abnormal events are investigated to ensure that facility events are thoroughly investigated to assess the impact of the event on facility operations, worker safety and health, the environment, and public welfare

2.3 Control of Equipment and System Status: Operating practices ensure that the facility configuration is consistent with design requirements and that the on-duty personnel know the status of equipment and systems.

Lines of Inquiry

2.4 Lockout and Tagout & Independent Verification

2.5 Operations Procedures

2.6 Communications:  Methods are in place and implemented to ensure that all facility personnel are promptly alerted to facility emergencies.

Performance Objective 3:  DOE Line Management Oversight

DOE has established and implemented a program that verifies that the contractor's organizations have effective policy/guidance for implementation of a Conduct of Operations Program